GET THEIR VOICES HEARD CONCERNING THE CARNAGE THAT IS TAKING PLACE IN OUR LAND.
WAS THE WELSH ASSEMBLY TRUNK ROAD AGENCY INSTRUMENTAL IN CLOSING A MAJOR TRUNK ROAD FOR THIS EVICTION TO TAKE PLACE?
WHY IS THIS HIGHLY DANGEROUS PIPELINE BEING WELDED ON OPEN MOUNTAIN TOPS WHEN IT SHOULD BE ROBOTICALLY WELDED IN FACTORY CONDITIONS FOR SAFETY?
ON FRIDAY 29TH JUNE 2007 AT THE TOWN HALL NEATH THE SAFE HAVEN NETWORK WILL HOST A MEETING WHERE 3 KEY COLUMBIAN PROTESTORS WILL COME TO MEET THE PROTESTORS OF THE SOUTH WALES PIPELINE. THEY WILL TELL THE PEOPLE OF WALES WHAT IS HAPPENING TO THEIR COUNTRY BECAUSE OF THE ENERGY THEFT OF MAJOR MULTI NATIONAL COMPANIES. HERE IN WALES WE HAVE THE SAME PROBLEMS.
LANDOWNERS HAVE ACCEPTED THEIR 30 PIECES OF SILVER AND WE ARE NO LONGER CAPABLE OF FEEDING OURSELVES DUE TO THE SUBSIDIES OF THE EUROPEAN UNION DESTROYING FARMING.
BLOOD MONEY RUNS IN THE RIVERS OF BRECON KILLING THE FISH THERE AS THE PROTESTORS ARE DRAGGED FROM THE TREES THEY HAVE FOUGHT SO VALIANTLY TO SAVE.
AT TREBANOS THE TREES ARE DYING DUE TO THE WATERCOURSES BEING AFFECTED BY THE LAYING OF THE PIPELINE. NATIONAL GRID PUTS WEED KILLER ON TO MOUNDS OF OUR SOIL THAT HAS LAIN ON TOP OF THE GROUND FOR 14 MONTHS ON A PLEDGE OF 3 MONTHS.
OTTERS ARE DYING IN THE TAWE RIVER. RUN OFF FROM PARC YNYSDERW AND IT'S MOUNDS OF SOIL CONTAINING ARSENIC AND OTHER CONTAMINANTS?
NATIONAL GRID STATE THEY WILL NOT DESTROY THE DINGLE YET THEY HAVE ALREADY DESTROYED ALL THE TREES SURROUNDING IT.
THE PEOPLE OF WALES NO LONGER HAVE A VOICE. THEIR OWN GOVERNMENT TURNS IT'S BACK AND ALLOWS THIS DESECRATION TO CONTINUE.
SAFE HAVEN NETWORK THANKS THE PROTESTORS OF THE DINGLE. YOU HAVE SHOWN A STRENGTH THAT ALL SHOULD FIND IN THEMSELVES
Comments
Hide the following 3 comments
Caps...
22.06.2007 05:20
Welsh Andy
So what
22.06.2007 20:30
Paul
explanations
22.06.2007 22:06
cheers!
me