Important information for anyone living near Parkwood landfill

Parkwood Landfill Action Group | 08.09.2005 11:40 | Ecology | Health | Sheffield

Following is an independent assessment of Viridor’s Planning Application to extend active waste tipping at Parkwood in Sheffield.

See also the Local Residents Fight Parkwood Landfill Expansion Proposals feature article from May 2005.


This application is misleading. It says that, if its proposals are put into practice, the landfill will be less of a nuisance to local residents and visitors to Parkwood Springs. We think that with the proposed changes, the landfill would be more of a nuisance. Viridor claim that, if its proposals are put into practice, the landfill will close eight years earlier than it would do under present planning permission. We can show that, according to Viridor’s own figures, the site will be in use for four years longer than it would be under the present permission.

Viridor threaten local residents that under present planning permission, they can tip waste within 5 metres of their homes. They are offering a deal: if they obtain planning consent to tip more active waste, then they will tip only inert waste within 50 metres of homes. We have inspected the plans, and they show that the threat applies to just four homes in Standish Gardens.

We believe that other ways can be found to avoid the tipping of active waste close to people’s homes.

Please read this document carefully, and then send your comments to Sheffield City Council’s planning department (details at end).

Will Parkwood landfill be more or less of a nuisance?

At present the landfill is divided into four cells. Three cells are owned by Viridor, and it has permission to tip active waste into these. Active waste is the kind that rots and smells, and is the source of any excessive numbers of flies nearby.

The fourth cell is owned by Sheffield City Council and leased to Viridor. There is only permission to tip inert waste (such as hardcore) in this cell. This application is for permission to tip active waste in cell 4.

It is logical to say that if tipping active waste in three cells causes a nuisance, then tipping active waste in four cells will cause more of a nuisance.

Viridor claim otherwise. They have employed consultants who have produced a report which says that odours from cell 4 (which is further from housing) will not be noticeable. They base this conclusion on the results of ‘modelling’. But this model is based on theoretical assumptions which bear no relation to what actually happens. Clearly the tipping of active waste already causes smells and other nuisances.

Why should we believe that if Viridor is failing to prevent cells 1 to 3 causing nuisances, that tipping active waste in cell 4 will not increase the problems already suffered by local residents?

Recently Viridor were given planning permission to install a leachate treatment plant (to process the foul liquid that runs out from the bottom of the tip) and engines that will use the gases produced by rotting waste to generate electricity. Sheffield City councillors who gave this permission were under the impression that these plants would prevent odours from being produced by the site.

There is no reason for thinking this. At present, gases coming from the site are collected and burnt in flares. The electricity generating engines will simply burn this gas in a different way. They will make no difference to the odours coming off this site.

The threat to Standish Gardens

If you go to the Council’s offices at Howden House and look at the planning application, you will see maps which show the site divided into four areas, A, B, C and D. Area D is the southern part where only inert waste can be tipped. Part of it lies between Standish Bank and the other areas where active waste can be tipped. At the northern end, the boundary of the site veers away from the houses. In between is an area where active waste can be tipped just five metres from the gardens of four of the houses in Standish Gardens.

These are the houses in most need of protection from the tipping. Can they be protected without accepting the rest of Viridor’s proposals? Landfill tax is charged at £16 per tonne of active waste dumped, and will rise by another £1 every year. This raises many millions, some of which should be used to offset the problems caused by landfill. Much of this money has not been spent. Clearly the residents of Standish Gardens are suffering from the problems created by landfill. These problems can be reduced by spending some of this money on creating a 50 metre zone of inert waste, and putting on that a bank of earth (Viridor proposes a 10 foot high ’bund’), or planting trees.

Local councils are responsible for applying for this money. You can ask your local councillor to make this happen.

Why do Viridor want to change the planning permission?

You may have seen letters to residents and press releases from Viridor which claim that “Viridor respects the wishes of local people and supports their aspirations by seeking early completion and restoration of the site.” Please look carefully at our assessment overleaf of whether Viridor’s proposals will actually lead to earlier completion.

Now look at our estimate of what Viridor will gain if this planning permission is granted.

Cell 4 has a capacity of 1 million tonnes. The cost of tipping inert waste is about £10 per tonne (not including tax). This figure is unlikely to increase due to inert waste being unavailable. Viridor have admitted it is difficult to obtain it. Assuming a generous 10% of this is for site operating costs, that would mean that the income from area 4 over its life would be £9 million, under present planning restrictions.

The cost of tipping active waste is currently about £30 per tonne (not including tax). Allowing 10% for operating costs, cell 4 would generate a total income after deduction of costs of £27 million. But the cost of tipping active waste is forecast to rise sharply, to as much as £66 per tonne by 2011. Taking a figure half way between these two of £48 per tonne gives a total income after costs of over £43 million.

The difference between that figure and the £9 million that would be generated by inert waste would be £34 million – the estimated value to Viridor of this planning application. (This information was printed in the September edition of the Burngreave Messenger.)

Viridor bought this site and the Salmon Pastures site in October 2002 for £20.6 million.

How long will the site be open? and when will it be returned to public use?

Viridor say that under their present planning permission (column 1), it will take 20 more years to fill the whole site with waste.

It is likely to be 10 years from the time when the last active waste is deposited until the whole site is safe for the public to walk on it. That would be 30 years from now.

Under the change proposed by Viridor (column 2), active waste tipping would end in 12 years. So the site would be safe and open to the public in 22 years.

Are Viridor’s figures misleading?

Column 3 is our estimate of what will actually happen under the existing planning consent, using Viridor’s own figures.

According to Viridor’s proposal, they can obtain enough active waste to fill 4 cells in 12 years. So that same amount of waste, deposited in the three existing cells, would fill them in 8 years.

That leaves cell 4 to be filled with inert waste. Viridor’s figures show that cell 4 has a capacity of 1 million tonnes. They obtain 105,000 tonnes of inert waste a year, but use 55,000 tonnes of this to cover the active waste. So they argue that it will take 20 years to fill cell 4 with the other 50,000 tonnes a year. But once active waste tipping has finished, all 105,000 tonnes a year will be available to fill cell 4. Cell 4 could therefore be filled 6 years after the other cells are full.

The site could be returned to public use just four years later, because that would be ten years after the end of active waste tipping. So what Viridor is telling us about what would happen if there is no change in the current planning permission is misleading. What would actually happen (according to Viridor’s own figures) is that active (smelly) waste would be put on the site for longer under Viridor’s proposal, and it would be longer before the whole site was safe and returned to public use.

If when you have read this, you wish to make comments to the planning authority, write quoting reference 05/02877/ful

to:

Development Services
Howden House
1 Union Street
Sheffield S1 2SH

or email planningdc@sheffield.gov.uk

Please send copies of your comments to your local councillors. They can be written to c/o Town Hall, Sheffield S1 2HH. Councillors for Burngreave ward are:

You can speak to your local councillors at their surgeries – details on the Council’s web site.

Parkwood Landfill Action Group

Comments

Display the following comment

  1. profits from the landfill site!!! — mr h j simpson

Kollektives

Birmingham
Cambridge
Liverpool
London
Oxford
Sheffield
South Coast
Wales
World

Other UK IMCs
Bristol/South West
London
Northern Indymedia
Scotland

Sheffield Topics

Afghanistan
Analysis
Animal Liberation
Anti-Nuclear
Anti-militarism
Anti-racism
Bio-technology
Climate Chaos
Culture
Ecology
Education
Energy Crisis
Fracking
Free Spaces
Gender
Globalisation
Health
History
Indymedia
Iraq
Migration
Ocean Defence
Other Press
Palestine
Policing
Public sector cuts
Repression
Social Struggles
Technology
Terror War
Workers' Movements
Zapatista

Sheffield [navigation.actions2016]

Sheffield [navigation.actions2015]

Sheffield [navigation.actions2014]

NATO 2014

Sheffield Actions 2013

G8 2013

Sheffield Actions 2012

Workfare

Sheffield Actions 2011

2011 Census Resistance
August Riots
Dale Farm
J30 Strike
Occupy Everywhere

Sheffield Actions 2010

Flotilla to Gaza
Mayday 2010
Tar Sands

Sheffield Actions 2009

COP15 Climate Summit 2009
G20 London Summit
Guantánamo
Indymedia Server Seizure
University Occupations for Gaza

Sheffield Actions 2008

2008 Days Of Action For Autonomous Spaces
Campaign against Carmel-Agrexco
Climate Camp 2008
G8 Japan 2008
SHAC
Smash EDO
Stop Sequani Animal Testing
Stop the BNP's Red White and Blue festival

Sheffield Actions 2007

Climate Camp 2007
DSEi 2007
G8 Germany 2007
Mayday 2007
No Border Camp 2007

Sheffield Actions 2006

April 2006 No Borders Days of Action
Art and Activism Caravan 2006
Climate Camp 2006
Faslane
French CPE uprising 2006
G8 Russia 2006
Lebanon War 2006
March 18 Anti War Protest
Mayday 2006
Oaxaca Uprising
Refugee Week 2006
Rossport Solidarity
SOCPA
Transnational Day of Action Against Migration Controls
WSF 2006

Sheffield Actions 2005

DSEi 2005
G8 2005
WTO Hong Kong 2005

Sheffield Actions 2004

European Social Forum
FBI Server Seizure
May Day 2004
Venezuela

Sheffield Actions 2003

Bush 2003
DSEi 2003
Evian G8
May Day 2003
No War F15
Saloniki Prisoner Support
Thessaloniki EU
WSIS 2003

Server Appeal Radio Page Video Page Indymedia Cinema Offline Newsheet

secure Encrypted Page

You are viewing this page using an encrypted connection. If you bookmark this page or send its address in an email you might want to use the un-encrypted address of this page.

If you recieved a warning about an untrusted root certificate please install the CAcert root certificate, for more information see the security page.

IMCs


www.indymedia.org

Projects
print
radio
satellite tv
video

Africa

Europe
antwerpen
armenia
athens
austria
barcelona
belarus
belgium
belgrade
brussels
bulgaria
calabria
croatia
cyprus
emilia-romagna
estrecho / madiaq
galiza
germany
grenoble
hungary
ireland
istanbul
italy
la plana
liege
liguria
lille
linksunten
lombardia
madrid
malta
marseille
nantes
napoli
netherlands
northern england
nottingham imc
paris/île-de-france
patras
piemonte
poland
portugal
roma
romania
russia
sardegna
scotland
sverige
switzerland
torun
toscana
ukraine
united kingdom
valencia

Latin America
argentina
bolivia
chiapas
chile
chile sur
cmi brasil
cmi sucre
colombia
ecuador
mexico
peru
puerto rico
qollasuyu
rosario
santiago
tijuana
uruguay
valparaiso
venezuela

Oceania
aotearoa
brisbane
burma
darwin
jakarta
manila
melbourne
perth
qc
sydney

South Asia
india


United States
arizona
arkansas
asheville
atlanta
Austin
binghamton
boston
buffalo
chicago
cleveland
colorado
columbus
dc
hawaii
houston
hudson mohawk
kansas city
la
madison
maine
miami
michigan
milwaukee
minneapolis/st. paul
new hampshire
new jersey
new mexico
new orleans
north carolina
north texas
nyc
oklahoma
philadelphia
pittsburgh
portland
richmond
rochester
rogue valley
saint louis
san diego
san francisco
san francisco bay area
santa barbara
santa cruz, ca
sarasota
seattle
tampa bay
united states
urbana-champaign
vermont
western mass
worcester

West Asia
Armenia
Beirut
Israel
Palestine

Topics
biotech

Process
fbi/legal updates
mailing lists
process & imc docs
tech